My 11th Article (2nd this year) has hit print. In the Sept/Oct NSR Magazine, I have a detailed BNSF AC44C4M build. I'm happy with how this one came out! There is also a great update on Bill Edgar's North Shore Int. (Duluth, MN to Thunder Bay, ON) layout. Hopefully I can get 1 or 2 more printed by the end of the year.
Tuesday, August 15, 2017
Thursday, August 10, 2017
3 Month Update
I've been horrible about keeping the blog up to date this summer. I'm happy to announce I have another article coming out in the upcoming issue of NSR. It is a full build up on my AC44C4M. 10 pages of fun!
It has been warm working on the layout, but I have been progressing just the same. Mostly scenery work. I was heavy into the making of trees, but now I have transitioned into roads. It feels good to be getting all this asphalt down.
To recap:
More trees in Hinckley. I have now planted two full boxes of Scenic Express Super Trees (250-ish trees). I think 4-5 more boxes will get me to a good place. MP 74 looks good, I need to fill in all the way to MP 75.
At the Horizon Mill, I added the fall protection system above the flour cars (yellow structure) and a radio tower behind the HQ.
I started experimenting with the Woodland Scenics Smooth-It Road system. I started with W 1st St in Rush City.
From there I went to CRR 133 in Hinckley. The Pan Pastel weathering really brought it home.
Next I added the blacktop to 415th St in North Branch. I mocked up Zinpro in Foam Core before I started the project. Since taking this photo I have weathered the blacktop, contoured the terrain between Zinpro and the road and I added the crossbucks at the grade crossing.
I mocked up the Titan office in Foam Core, but then I got excited, so I built the styrene verion. I still need to paint it, but I have since added the grass to the right of the building and one of the AC units outside. I hope to install the Titan-Lansing sign tonight.
I think that gets everyone caught up with the bulk of the work. Hopefully my next update will come sooner!
It has been warm working on the layout, but I have been progressing just the same. Mostly scenery work. I was heavy into the making of trees, but now I have transitioned into roads. It feels good to be getting all this asphalt down.
To recap:
More trees in Hinckley. I have now planted two full boxes of Scenic Express Super Trees (250-ish trees). I think 4-5 more boxes will get me to a good place. MP 74 looks good, I need to fill in all the way to MP 75.
At the Horizon Mill, I added the fall protection system above the flour cars (yellow structure) and a radio tower behind the HQ.
I started experimenting with the Woodland Scenics Smooth-It Road system. I started with W 1st St in Rush City.
From there I went to CRR 133 in Hinckley. The Pan Pastel weathering really brought it home.
Next I added the blacktop to 415th St in North Branch. I mocked up Zinpro in Foam Core before I started the project. Since taking this photo I have weathered the blacktop, contoured the terrain between Zinpro and the road and I added the crossbucks at the grade crossing.
I mocked up the Titan office in Foam Core, but then I got excited, so I built the styrene verion. I still need to paint it, but I have since added the grass to the right of the building and one of the AC units outside. I hope to install the Titan-Lansing sign tonight.
I think that gets everyone caught up with the bulk of the work. Hopefully my next update will come sooner!
Subscribe to:
Posts (Atom)