This has been a busy month. I finally finished some engines for a friend in Chicago and got them off my workbench. I had an MRC Sound decoder fail in SCXY 1325, so I swapped an ESU LokSound Micro in its place (huge improvement). I am having fun making layout progress right now, so that has been a big focus of the month.
I made some more progress on Ivy Farms Trucking. I added the shingled roof to the main building. I also repainted the pole barn and got it weathered.
I got the Creekside Cafe almost done. The outside is painted, roof is on, and signage was added for the cafe and the Other Side Bar.
Inside I added tables, chairs, bar stools and a pool table.
I got a Willy's to park outside the Corp. HQ. That was fun to paint.
More trees planted in Hinckley.
I completed a sideboom crawler I've had on the bench for years.
I added some powerlines in Rush City. there will be more of them coming soon.
I added the camera pole for the Mill. The solar panel is a decal.
And I ran trains. This run helped me find a troublesome spot in my 5/6 switch. A quick shim on the throwbar in it was back in service.
Hopefully December is as fruitful as November was!
Showing posts with label Scenery. Show all posts
Showing posts with label Scenery. Show all posts
Sunday, November 26, 2017
Thursday, August 10, 2017
3 Month Update
I've been horrible about keeping the blog up to date this summer. I'm happy to announce I have another article coming out in the upcoming issue of NSR. It is a full build up on my AC44C4M. 10 pages of fun!
It has been warm working on the layout, but I have been progressing just the same. Mostly scenery work. I was heavy into the making of trees, but now I have transitioned into roads. It feels good to be getting all this asphalt down.
To recap:
More trees in Hinckley. I have now planted two full boxes of Scenic Express Super Trees (250-ish trees). I think 4-5 more boxes will get me to a good place. MP 74 looks good, I need to fill in all the way to MP 75.
At the Horizon Mill, I added the fall protection system above the flour cars (yellow structure) and a radio tower behind the HQ.
I started experimenting with the Woodland Scenics Smooth-It Road system. I started with W 1st St in Rush City.
From there I went to CRR 133 in Hinckley. The Pan Pastel weathering really brought it home.
Next I added the blacktop to 415th St in North Branch. I mocked up Zinpro in Foam Core before I started the project. Since taking this photo I have weathered the blacktop, contoured the terrain between Zinpro and the road and I added the crossbucks at the grade crossing.
I mocked up the Titan office in Foam Core, but then I got excited, so I built the styrene verion. I still need to paint it, but I have since added the grass to the right of the building and one of the AC units outside. I hope to install the Titan-Lansing sign tonight.
I think that gets everyone caught up with the bulk of the work. Hopefully my next update will come sooner!
It has been warm working on the layout, but I have been progressing just the same. Mostly scenery work. I was heavy into the making of trees, but now I have transitioned into roads. It feels good to be getting all this asphalt down.
To recap:
More trees in Hinckley. I have now planted two full boxes of Scenic Express Super Trees (250-ish trees). I think 4-5 more boxes will get me to a good place. MP 74 looks good, I need to fill in all the way to MP 75.
At the Horizon Mill, I added the fall protection system above the flour cars (yellow structure) and a radio tower behind the HQ.
I started experimenting with the Woodland Scenics Smooth-It Road system. I started with W 1st St in Rush City.
From there I went to CRR 133 in Hinckley. The Pan Pastel weathering really brought it home.
Next I added the blacktop to 415th St in North Branch. I mocked up Zinpro in Foam Core before I started the project. Since taking this photo I have weathered the blacktop, contoured the terrain between Zinpro and the road and I added the crossbucks at the grade crossing.
I mocked up the Titan office in Foam Core, but then I got excited, so I built the styrene verion. I still need to paint it, but I have since added the grass to the right of the building and one of the AC units outside. I hope to install the Titan-Lansing sign tonight.
I think that gets everyone caught up with the bulk of the work. Hopefully my next update will come sooner!
Subscribe to:
Posts (Atom)