Showing posts with label Rock Creek. Show all posts
Showing posts with label Rock Creek. Show all posts

Tuesday, November 29, 2016

The November Break

In November I have to start making sure I take days off, before New Years hits. I took advantage of the time to make some Skally progress.
I've been working one end of the line to the other... in Rush City I added the roof to the engine house. I need to add some details and then paint it up. I also weathered all the new flour cars, so they don't look so... new.
 I added some sidewalks to 4th St. Now I need to fill in the park and add an artillery piece.
I forgot to mention I also started the electrical substation that sits just North of the Ardent Mill.
 I added the newest customer on the line, Interstate Energy. The LPG cars are already off-loading.
 I scratch built the unloading racks. I'll go back an spruce the scene up later, but it works for now.
 I finally made it back to the Rock Creek bridge. Sorry for the bad exposure on the shot. I hope to get some track permanently set soon on this one.
Tiller, or should I say "Titan-Lansing" now has started to materialize. I mocked up the sand sorting and cleaning tower (to scale) out of foamcore and I built the loadout shed (out of styrene). The construction trailer is there to remind me to finish the scene...
Lots of progress, but nothing done, so it goes.

Tuesday, April 28, 2015

Layout Progress

I've been bouncing between projects, try to get a little done across the board. I'm getting Rush City v3.2 ready for track. I gave it a coat of paint to seal the cork. Then I glues down all the PCB ties for the module ends. Next up is drilling all the holed for feeders, throwbars and so on. This 12 feet of modules will hold over 1 scale mile of track, the SCXY Corp. HQ, SCXY engine house, two grade crossings and the Ardent Flour Mill when they are done.
Up in Hinckley I'm getting ready to install the crossing gates. I picked these up from Azatrax for a good price.
Here is the north end of Rush City v2 getting ready for re-purposing. I pulled out my #10 crossover for use in v3.2. I saved as much track as possible for the new destination.
A short while later the track was pulled and this module became the South end of Hinckley. I grabbed some foam to rough up for the new Hinckley Hwy 61 overpass. I will be installing a #10 switch for the South Hinckley Switch. Then the SCXY interchange track will be in business.
Over on the old South Rush City module (now Rock Creek) I got the cork in and smoothed out the land forms. I need to build the bridge piers, but I am short one #10 RH switch for this module, so it will probably be placed on the back burner until Atlas gets more switches in the U.S..
Well, that's all for now, I'll be posting more layout and locomotive progress soon!