Work is progressing on Rush City. I worked on the track layout tonight. It helps that I have the main part of the Horizon Mill complete. I used a stand in building for the SCXY HQ. The track will all be code 55 on the main and passing siding and I want to use code 40 to the mill. I got some of the cork started but I will use a sheet of 3/16" cork around the mill to keep the ground as flat as it is in reality. Switches between the Main Line and Passing Siding will be #10s, all the others will be #7s.
The flour loadouts on the south end of the building curve just after coming out of the building, I will try to match that in my model.
Looks Great!
ReplyDelete