It was time to start on the Tiller Corp. buildings. I decided to start by scratch building the main sand silos. I scratch build them with 7/8" wooden dowel, .010" and .020" sheet styrene and .080" styrene H beam. They stand about 3 1/2" tall and will be a nice start to the complex once I get some detail parts on them and get them painted.
No comments:
Post a Comment